Winter Raymond mill maintenance precautions
Winter Raymond mill maintenance precautions:
Yesterday, the beginning of winter, in this cold winter we should pay attention to warm clothes! The maintenance of a large raymond mill in the cold winter is also important and takes longer than in summer because the cement is completely solidified after the foundation has been treated.
1, the first winter roll assembly and some other parts of the refueling should be replaced by butter for winter, so that in the cold winter butter is not easy to freeze.
2, Second, when the boot can be preheated for 5 minutes, and then start feeding production. When the first open analysis machine boot, and then open the last fan to open the host.
3, in the winter monsoon is relatively large, outdoor dusting bag Raymond mill must be tight, do not loose, bag once a day beating, keep breathable. Bag is not breathable, Raymond mill is no production. Raymond mill plus use roller grinding, the principle of wind selection crushed material, so the use of wind is very crucial. The law of nature is to heat up cold shrinkage, this time Raymond mill screws can be tight again, the flange of the link must check the open seal is qualified to ensure that there is no place for gas leaks.
In addition, some users will ask Raymond mill output will be higher than usual production, is not the principle of thermal expansion and contraction, the winter material is more brittle and easier to process it?
My company's Raymond mill engineer said the winter Raymond mill boot maintenance should pay more attention than in summer, especially Raymond mill in the outdoor processing of materials users should pay attention to Raymond mill maintenance, butter is best to use Winter-specific, general butter winter is not easy to get into, the roller assembly will wear more powerful.